几十年来, lovesport爱博体育 施工管理 has been a leader in innovation, 驾驶技术, processes and products that streamline construction activities and deliver sustainable and energy-saving results across the built environment. From pioneering motion-sensing lighting fixtures in the 1980s, 设计干墙的新配方, and delivering the first LEED Platinum office tower in New York City to seeking out, 测试, 验证不断发展的技术, we are driven by our unrelenting need to better serve our clients through innovation.    

创新工具 

  • Building Information Modeling (BIM) lovesport爱博体育 discovers schedule and cost efficiencies, enhances site safety and optimizes long-term asset performance through detailed models at every stage of a project’s lifecycle:
  • 3D MEP: Modeling, visualization and clash detection
  • 4D Site: Logistics, sequencing and scheduling
  • 5D成本:估算和参数化建模
  • 6D设施:运营和管理

One设计 

  • The process: We hire and manage a team of independent detailers and oversee an in-depth coordination between the MEP systems before contractor award
  • The result: A more detailed set of 100% CDs that represents a higher level of coordination with consideration given to design efficiencies and constructability issues – with a significant impact on contractor bidding and implementation costs

互联模型  

  • The process: We hire and manage an independent connection modeler and engineer to determine the structural steel connections before contractor award
  • The result: Significant reduction of bidder contingencies and the spread between the bidders – and since the model can be used to create shop drawings, the fabrication process can start months earlier

捕获  

  • A prototype tool that aggregates and analyzes data created during the course of a construction project to track progress, 性能和安全合规性

H工作室 

  • A laboratory for exploring the design and construction benefits of modular and prefabricated project components in the healthcare sector.

特色项目

新奥尔良的梅赛德斯-奔驰体育场

新奥尔良的梅赛德斯-奔驰体育场, LA

The stadium has a one-of-a-kind retractable roof that uses a system of eight panels that slide open, in less than 8 minutes; similar to a camera shutter opening and closing. It also features a 360-degree HD ‘halo’ video board at 58′ tall and 1,100′ in diameter. 

  • 八板可伸缩屋顶
  • 有史以来第一个360度光晕视频板
  • 兆柱LED显示屏
  • 城市广场的窗口
威廉·P. 克莱门茨小. 大学医院,达拉斯,德克萨斯州

威廉·P. 克莱门茨小. 大学医院,达拉斯,德克萨斯州

The construction of this hospital included multi-trade prefabrication and modular construction for patient room bathrooms, patient room headwalls and utility tunnel piping racks for mechanical, 电气和消防洒水车行业. This helped to reduce first costs, improve schedule, amplify quality and enhance safety. lovesport爱博体育 Hunt also spear-headed the effort and constructed mock-ups for the patient rooms, 或者是, ER, ICU’s and Cath Lab in a phased delivery approach. The phased mock-ups allowed the staff and physicians to find the best solution for delivery of care. 

  • 预制浴室
  • 预制病人头墙
  • 预制隧道管路
  • 预制走廊货架

纽约公园大道425号

The first full-block commercial building constructed on Park Avenue in nearly 60 years, 640,000-SF 425公园高897英尺. In order to maximize the size of 425 Park while conforming to existing zoning code criteria, our team had to reuse 25% of the previous building that occupied the site and incorporate it into the new office tower under construction at 425 Park. 125年结婚,000 square feet of the original steel foundations to the new steel structure was a complex endeavor. 14个中的每一个,000 connection points had to be carefully analyzed to ensure the new structure could support the weight of the building and the structural loads were balanced accordingly. 

  • Unique features include a 45-foot-tall lobby – the tallest in Midtown
  • Features an advanced air filtration process and a 25% reduction in connected energy load.
  • Redesign of the new footings while the building was supported by a shoring system
  • USGBC LEED金牌
  • WELL建筑标准